Stoping is the removal of the wanted ore from an underground mine leaving behind an open space known as a stope.[1] Stoping is used when the country rock is sufficiently strong not to cave into the stope, although in most cases artificial support is also provided. As mining progresses the stope is often backfilled with tailings, or when needed for strength, a mixture of tailings and cement.

In the past stoping took place with manual tools or by fire-setting; later gunpowder was used, and from the 19th century various other explosives and power-tools came into use.

In old mines, stopes frequently collapse at a later time, leaving craters at the surface. They are an unexpected danger when records of underground mining have been lost with the passage of time.


Types of stoping

Stoping with an air drill in an American iron mine in the 20th century (museum exhibit)
A large stope in the Treadwell gold mine, Alaska, USA 1908; an example of shrinkage stoping

A stope can be created in a variety of ways, depending on the geology of the ore body being mined. It is common to dig shafts vertically downwards to reach the ore body and then drive horizontal levels through it. Stoping then takes place from these levels, in its simplest form as overhand and underhand stoping, which refer to the removal of ore from above or below the level, respectively. In steeply-dipping ore bodies, such as lodes of tin, the stopes become long narrow near-vertical spaces, which, if one reaches the surface is known as agunnis or coffen. A common method of mining such vertical ore bodies is stull stoping, see below.

When the ore body is more or less horizontal, various forms of room and pillar stoping, cut and fill, or longwall mining can take place.

[edit]Stull stoping

Stull stoping is a form of stoping used in hardrock mining that uses systematic or random timbering ("stulls") placed between the foot and hanging wall of the vein. The method requires that the hanging wall and often the footwall be of competent rock as the stulls provide the only artificial support. This type of stope has been used up to a depth of 3,500 feet (1,077 m) and at intervals up to 12 feet (3.7 m) wide.The 1893 mining disaster at Dolcoath mine in Cornwall was caused by failure of the stulls holding up a huge weight of waste rock.

[edit]Shrinkage stoping

Shrinkage stope mining, or shrinkage stoping, is most suitable for steeply dipping ore bodies (70°—90°). In shrinkage stoping, mining proceeds from the bottom upwards, in horizontal slices (similar to cut and fill mining), with the broken ore being left in place for miners to work from. Because blasted rock takes up a greater volume than in situ rock (due to swell factor), some of the blasted ore (approximately 40%) must be removed to provide working space for the next ore slice. Once the top of the stope is reached all the ore is removed from the stope. The stope may be backfilled or left empty depending on the rock conditions.


[edit]Long hole stoping

A large stope in a salt mine in Poland - now converted into a tourist attraction

Long hole stoping can be the lowest cost method when large ore bodies are located in strong country rock. In operation, it is similar to an underground version of quarrying.

The best book

Prayer Times

Click here




Office hours


Sunday:     12-1

Monday:     12-1

Tuesday:     10-12

Wednesday: 10-11

You are welcome to contact me by at any time

You  may also contact me via WhatsApp group, ..

Ext. 2524

Civil Eng. Students

DON'T miss!


Love your department and be proud of your field of study

As we approaching the second midterm exams..  Get ready and remember our offices are open to answer you . do not hesitate to .contact me if you have difficulties


For CE 370 students : I do apologize for did not attend the extra lab session that proposed to be on Wednesday at 6 am.  Sorry

Good Luck


Announcements


My Dear Students

Please visit the  announcement box for the relevant course and make sure that you can download and upload easily, otherwise

.contact me  to sort it out

There will be an orientation session in the midell of this term to help you select your track in Civil and Environmental Engineering

Event

Special Issue

Electrical Power Resources: Coal versus Renewable Energy



  Published Online on January 2016


Mining Engineering


Mining engineering is an engineering discipline that involves practice, theory, science, technology, and the application of extracting and processing minerals from a naturally occurring environment. Mining engineering also includes processing minerals for additional value.

Environmental Engineering

Environmental engineers are the technical professionals who identify and design solutions for    environmental problems. Environmental engineers provide safe drinking water, treat and properly dispose of wastes, maintain air quality, control water pollution, and remediate sites contaminated due to spills or improper disposal of hazardous substances. They monitor the quality of the air, water, and land. And, they develop new and improved means to protect the environment.

Proverb

Actions speak louder than words

Tawasl

تواصل

College of Eng. MU

http://mu.edu.sa/ar


Univeristies

Universities I've worked in


Assuit University (Home University), Egypt


Imperial College, London, UK


Faculty of Engineering, Al-Mergeb University, Libya


King Saud University, KSA

,Majmaah University


Majmaah University has a very nice web page that provide  all information regarding deanships, colleges, activities,  campuses and many others. Search your request in
http://mu.edu.sa/en

Also visit

My Academic Pages

https://www.researchgate.net/profile/Sameh_Ahemd

and give me


Think


How many red balls we need to make balance 

Sports

Egypt vs Tunisia (Handball final)  30/1/2016


Currency Converter


Click here

Translate


Click here

Course 2016/17-1


  1. Computer Applications in Surveying  CE 473
  2. Surveying 1 CE 370
  3. Photogrammetry CE 474
  4. Surveying II  CE 371
  5. Design I  (round 4) CE 498




The Rules of Life

Rule #7

Latest

Member of the Editorial Board: " Journal of Water Resources and Ocean Sciences"  2013

https://www.researchgate.net/profile/Sameh_Ahmed5/?ev=hdr_xprf

Participating in The Third International Conference on Water, Energy and Environment,(ICWEE) 2015 - American University of Sharjah, UAE 24-26 March 2015 with a Paper and Poster

New article

Recovery of Titania from Waste-Sludge of Majmaah Water Treatment Plant

"Production of Titania Nano-particles from Wast-

Sludge

Coming soon



Results of M2 CE311

Student Conference



Participation  in the 6Th Student Conference

With a paper and oral presentation

From the Senior Design Project CE499 -35

See inside, the paper, and presentation

CE 370 Course

Surveying  I -  CE 370 - 2016-2017-1




Power point


Sheets


Lecture notes


Second Midterm Exam



Results


Model Answer
Inside, please follow:

Student Performance Records

CE 371 Course

Surveying II - CE 371 - 2016-2017-1




Lectures





First midterm exam


Lab


Results

See Inside

Student Performance Records

CE473 Course

Computer Applications in Surveying

CE 473



Lecturers


Power point


Sheets


Exams + Quizzes


Results




CE 474 Course

2015-2016-2 - Photogrammetry  CE474




Available 0-1-2-3-4 Power point

Available

Quizzes 2 and 3 with model Answer

Quizzes
Available Chapter 1,2,3,4,5 Lecture notes

Report 1  Cameras Report

Y

60 marks Exams

See Inside

Student Performance Records


CE 360 Course

Environmental Engineering 1



CE 360: Environmental Engineering 1

37-2

Y PP0-1-2-3,4 Power point
Y 1,2,3,4,5 Chapters

Water quality Poster + Climate Change Reports
will be announced (Quiz #2 will be using D2L- Online Quizzes

Y

Quizzez 2,3 and 4 with model answer and results Exams and results

GE 306 Course

Engineering Report Writing


GE 306: Engineering Report Writing

CE 499 Course

Senior Design 2 - CE 499

Meeting on 14-4-2015

Second Best paper from Senior Design Projects in 2015

Paper title:

Evaluation of Groundwater Quality Parameters using Multivariate Statistics- a case Study of Majmaah, KSA

Students:

Abdullah A. Alzeer

Husam K. Almubark

Maijd M. Almotairi

CE 360-Summer Course

Environmental Engineering I


Welcome to CE360 second Term 2015-2016 

Engineering Practice

 Engineering Practice GE 307

What is your opinion

Contact me

Mobile: 00966598311652

s.mohamed@mu.edu.sa

Civil and Environmental Engineering Department
College of Engineering, Majmaah University
Majmaah, P.O. 66, 11952, KSA

Thank you

Your frequent visit to my website has helped  a lot to get the 2nd place in the university competition in the  year 1434-2013... Thanks very mush and please keep following my work

زيارتكم المتكررة لموقعي ساهمت في حصولي على المركز الثاني لاحسن المواقع الشخصية بجامعة المجمعة ...لكم جميعا خالص شكري وتقديري

CE 212 - Summer Course

Properties and Strength of Materials 1

CE 212

Y from PP0 to PP 6 + PDF Power points
Y Midterm #2 + Model Answer + results Exams
Y lab 3 Labs

Solution of Quiz 4 + Results HW


CE 311- Summer Course

Soil Mechanics and Foundation Engineering

CE 311

M2+ model Answer + PP 1-9 = PDF 1-9 all are available

Sheets 2 + 4 with model Answers

Results of M2



إحصائية الموقع

عدد الصفحات: 1412

البحوث والمحاضرات: 1541

الزيارات: 51089