Nameplate capacity

Nameplate capacity



Nameplate capacity, also known as the rated capacity, nominal capacity, installed capacity or maximum effect, is the intended full-load sustained output of a facility such as a power plant,[1][2] a chemical plant,[3] fuel plant,[4][5][6] metal refinery,[7] mine,[8] and many others.

For dispatchable power, this capacity depends on the internal technical capability of the plant to maintain output for a reasonable amount of time (for example, a day), neither momentarily nor permanently, and without considering external events such as lack of fuel or internal events such as maintenance.[9] Actual output can be different from nameplate capacity for a number of reasons depending on equipment and circumstances.

Office Hours

Monday 10 -2

Tuesday 10-12

Thursday 11-1

My Timetable


Contacts


email: [email protected]

[email protected]

Phone: 2570

Welcome

Welcome To Faculty of Engineering

Almajmaah University


IEEE


http://www.ieee.org/

/

Links of Interest


http://www.utk.edu/research/

http://science.doe.gov/grants/index.asp

http://www1.eere.energy.gov/vehiclesandfuels/

http://www.eere.energy.gov/


Travel Web Sites

http://www.hotels.com/

http://www.orbitz.com/

http://www.hotwire.com/us/index.jsp

http://www.kayak.com/

Blackboard

ستقام اختبارات الميدتيرم يوم الثلاثاء 26-6-1440

حسب الجدول المعلن بلوحات الاعلان

Summer training

The registration for summer training will start from 5th week of second semester

Academic advising

Class registration week 1

برنامج التجسير




إحصائية الموقع

عدد الصفحات: 2879

البحوث والمحاضرات: 1280

الزيارات: 64068