involves planning effectively for the after-mining landscape – all activities required before, during, and after the operating life of a mine that are needed to produce an acceptable landscape economically. Closure performance refers to the activities near and after mine closure and how well activities listed in the closure plan are carried out.

A mine begins to close the day it opens. Decisions made during the mine planning and development phase – and even earlier, during the exploration phase – have profound effects on the ultimate closure plan, its cost, and the resulting landscape performance. These decisions need to be made within a framework of closure planning to realize successful land reclamation.

Activities related to closure planning often include: preparation of detailed drawings of disturbed landscape, compilation of baseline information, discussions with regulators and stakeholders on end land use considerations, crafting of supporting research programs, and preparation of budgets and schedules. For a mine nearing closure, the closure plan takes the form of a decommissioning plan, and includes details and selection of mitigative technologies (especially for acid rock drainage) and other specific reclamation and closure activities.

A critical element of successful reclamation and of good closure planning is stakeholder involvement. Generally, mines do a poor job of ongoing, meaningful stakeholder consultation, and many would benefit from professional assistance. A particularly useful consultation process involves forming a local committee to provide guidance to one or more mines in the region in their reclamation and closure activities with a focus on providing ongoing dialog with stakeholders and identifying the goals important to stakeholders.

The most important benefit of closure planning is identification of critical activities to achieve successful reclamation. Closure planning usually identifies areas of needed research. It also identifies planning constraints (and sometimes opportunities) especially identifying safe methods and locations for tailings storage. These plans provide some assurance that the mine is not “painting itself into a corner” and provide a starting basis to estimate financial assurance levels – important to both mines and regulators. It also forms a base case against which future planning changes can be compared. Much of this work falls under the concept of “design for closure” introduced 30 years ago.

Typical closure plans are 100 to 200 page documents that require several months to prepare and cost approximately US0,000. They are usually developed by the supervisor of the environmental department, or by a mining, environmental, or geotechnical consultant. They are submitted at the request of the regulatory authority and are used by the mine for life of mine costing.

Most closure planning documents share the same format:

  1. Introduction
  2. Predevelopment conditions
  3. Mine operations explained
  4. Landscape performance goals (and regulatory requirements)
  5. Reclamation technologies and methods
  6. Reclamation plans, balances, waste isolation methods
  7. Long term monitoring and maintenance plans
  8. Landscape performance prediction
  9. Comparison of the performance prediction relative to the goals
  10. Schedules and costs
  11. Financial assurance

The best book

Prayer Times

Click here

Office hours

Sunday:     12-1

Monday:     12-1

Tuesday:     10-12

Wednesday: 10-11

You are welcome to contact me by at any time

You  may also contact me via WhatsApp group, ..

Ext. 2524

Civil Eng. Students

DON'T miss!

Love your department and be proud of your field of study

As we approaching the second midterm exams..  Get ready and remember our offices are open to answer you . do not hesitate to .contact me if you have difficulties

For CE 370 students : I do apologize for did not attend the extra lab session that proposed to be on Wednesday at 6 am.  Sorry

Good Luck


My Dear Students

Please visit the  announcement box for the relevant course and make sure that you can download and upload easily, otherwise

.contact me  to sort it out

There will be an orientation session in the midell of this term to help you select your track in Civil and Environmental Engineering


Special Issue

Electrical Power Resources: Coal versus Renewable Energy

  Published Online on January 2016

Mining Engineering

Mining engineering is an engineering discipline that involves practice, theory, science, technology, and the application of extracting and processing minerals from a naturally occurring environment. Mining engineering also includes processing minerals for additional value.

Environmental Engineering

Environmental engineers are the technical professionals who identify and design solutions for    environmental problems. Environmental engineers provide safe drinking water, treat and properly dispose of wastes, maintain air quality, control water pollution, and remediate sites contaminated due to spills or improper disposal of hazardous substances. They monitor the quality of the air, water, and land. And, they develop new and improved means to protect the environment.


Actions speak louder than words



College of Eng. MU



Universities I've worked in

Assuit University (Home University), Egypt

Imperial College, London, UK

Faculty of Engineering, Al-Mergeb University, Libya

King Saud University, KSA

,Majmaah University

Majmaah University has a very nice web page that provide  all information regarding deanships, colleges, activities,  campuses and many others. Search your request in

Also visit

My Academic Pages


and give me


How many red balls we need to make balance 


Egypt vs Tunisia (Handball final)  30/1/2016

Currency Converter

Click here


Click here

Course 2016/17-1

  1. Computer Applications in Surveying  CE 473
  2. Surveying 1 CE 370
  3. Photogrammetry CE 474
  4. Surveying II  CE 371
  5. Design I  (round 4) CE 498

The Rules of Life

Rule #7


Member of the Editorial Board: " Journal of Water Resources and Ocean Sciences"  2013


Participating in The Third International Conference on Water, Energy and Environment,(ICWEE) 2015 - American University of Sharjah, UAE 24-26 March 2015 with a Paper and Poster

New article

Recovery of Titania from Waste-Sludge of Majmaah Water Treatment Plant

"Production of Titania Nano-particles from Wast-


Coming soon

Results of M2 CE311

Student Conference

Participation  in the 6Th Student Conference

With a paper and oral presentation

From the Senior Design Project CE499 -35

See inside, the paper, and presentation

CE 370 Course

Surveying  I -  CE 370 - 2016-2017-1

Power point


Lecture notes

Second Midterm Exam


Model Answer
Inside, please follow:

Student Performance Records

CE 371 Course

Surveying II - CE 371 - 2016-2017-1


First midterm exam



See Inside

Student Performance Records

CE473 Course

Computer Applications in Surveying

CE 473


Power point


Exams + Quizzes


CE 474 Course

2015-2016-2 - Photogrammetry  CE474

Available 0-1-2-3-4 Power point


Quizzes 2 and 3 with model Answer

Available Chapter 1,2,3,4,5 Lecture notes

Report 1  Cameras Report


60 marks Exams

See Inside

Student Performance Records

CE 360 Course

Environmental Engineering 1

CE 360: Environmental Engineering 1


Y PP0-1-2-3,4 Power point
Y 1,2,3,4,5 Chapters

Water quality Poster + Climate Change Reports
will be announced (Quiz #2 will be using D2L- Online Quizzes


Quizzez 2,3 and 4 with model answer and results Exams and results

GE 306 Course

Engineering Report Writing

GE 306: Engineering Report Writing

CE 499 Course

Senior Design 2 - CE 499

Meeting on 14-4-2015

Second Best paper from Senior Design Projects in 2015

Paper title:

Evaluation of Groundwater Quality Parameters using Multivariate Statistics- a case Study of Majmaah, KSA


Abdullah A. Alzeer

Husam K. Almubark

Maijd M. Almotairi

CE 360-Summer Course

Environmental Engineering I

Welcome to CE360 second Term 2015-2016 

Engineering Practice

 Engineering Practice GE 307

What is your opinion

Contact me

Mobile: 00966598311652

[email protected]

Civil and Environmental Engineering Department
College of Engineering, Majmaah University
Majmaah, P.O. 66, 11952, KSA

Thank you

Your frequent visit to my website has helped  a lot to get the 2nd place in the university competition in the  year 1434-2013... Thanks very mush and please keep following my work

زيارتكم المتكررة لموقعي ساهمت في حصولي على المركز الثاني لاحسن المواقع الشخصية بجامعة المجمعة ...لكم جميعا خالص شكري وتقديري

CE 212 - Summer Course

Properties and Strength of Materials 1

CE 212

Y from PP0 to PP 6 + PDF Power points
Y Midterm #2 + Model Answer + results Exams
Y lab 3 Labs

Solution of Quiz 4 + Results HW

CE 311- Summer Course

Soil Mechanics and Foundation Engineering

CE 311

M2+ model Answer + PP 1-9 = PDF 1-9 all are available

Sheets 2 + 4 with model Answers

Results of M2

إحصائية الموقع

عدد الصفحات: 1412

البحوث والمحاضرات: 1541

الزيارات: 58846